{"id":3297,"date":"2026-08-02T20:28:03","date_gmt":"2026-08-02T18:28:03","guid":{"rendered":"https:\/\/prepp.net\/?post_type=news&#038;p=3297"},"modified":"2026-08-02T20:29:33","modified_gmt":"2026-08-02T18:29:33","slug":"federal-network-agency-emergency-platform-for-long-term-power-outages","status":"publish","type":"news","link":"https:\/\/prepp.net\/en\/news\/bundesnetzagentur-notfallplattform-langanhaltende-stromausfaelle\/","title":{"rendered":"Federal Network Agency Plans Emergency Platform for Long-Term Power Outages"},"content":{"rendered":"<p>The Federal Network Agency is preparing for possible <strong>Long-lasting power shortages and large-scale power outages<\/strong> in the foreground. At the center is the construction of a new <strong>\u201ePower Security Platform\u201c<\/strong>, with which the consumption of large industrial companies can be coordinated and reduced if necessary in an emergency.<\/p>\n<p>The plans show that the authorities are also preparing for extraordinary crisis scenarios. A widespread blackout is still considered very unlikely. Nevertheless, clear procedures should be in place in case the power supply cannot be fully guaranteed for a longer period of time.<\/p>\n<h2>New platform to coordinate electricity consumption<\/h2>\n<p>The planned platform is initially aimed at <strong>energy-intensive companies with particularly high electricity consumption<\/strong>. These are intended to report their current needs in a tense supply situation and, if necessary, to deliberately reduce their consumption.<\/p>\n<p>The goal is to stabilize the power grid and prevent uncontrolled outages. Through a coordinated reduction in consumption, particularly important facilities and critical infrastructures could continue to be supplied for as long as possible.<\/p>\n<h2>Berlin blackout reveals weaknesses<\/h2>\n<p>How important functioning crisis preparedness is was demonstrated at the beginning of the year by the multi-day power outage in southwestern Berlin. After an alleged arson attack on a cable bridge, <strong>around 45,000 households, more than 100,000 people, and around 2,200 commercial businesses<\/strong> for days without electricity and partly also without heating.<a href=\"https:\/\/prepp.net\/news\/berlin-brandanschlag-strommasten-stromausfall\/\">we<\/a> <a href=\"https:\/\/prepp.net\/news\/grossflaechiger-stromausfall-berlin-brandanschlag-2026-01-03\/\">reported<\/a>The Berlin Senate then appointed an independent expert commission.<\/p>\n<p>The crisis report, which has since been published, comes to a critical conclusion: Although the situation was ultimately managed, the incident simultaneously exposed significant weaknesses in disaster protection. Deficiencies in communication with the public, gaps in emergency power supply, and problems due to the failure of mobile networks are mentioned. The experts describe the attack as <strong>Wake-up call for Berlin and other major cities<\/strong>.<\/p>\n<p>Key recommendations include establishing a central crisis center, improving coordination between authorities and emergency services, additional emergency power capacities, and better preparedness of the population for prolonged critical infrastructure outages.<\/p>\n<h2>Prevention instead of alarm<\/h2>\n<p>The Federal Network Agency emphasizes that the new platform is a <strong>purely precautionary measure<\/strong> represented. The plans are not an indication that a prolonged power outage or an acute electricity shortage is imminent.<\/p>\n<p>Germany continues to have one of the most reliable power grids in Europe. Nevertheless, the authority wants to be prepared for scenarios that, while rare, could have significant effects on the economy and society in an emergency.<\/p>\n<h2>Planned measures with advance notice<\/h2>\n<p>The focus is primarily on crisis situations that are already apparent several days in advance. Unlike a sudden technical defect or a local power outage, consumer restrictions in such cases could be planned and coordinated early on.<\/p>\n<p>Large companies would then not be disconnected from the grid surprisingly, but could reduce their electricity consumption in a controlled manner. This is intended to avoid abrupt and uncoordinated shutdowns.<\/p>\n<h2>Energy crisis and geopolitical risks as a backdrop<\/h2>\n<p>The energy crisis of recent years, geopolitical tensions, and increasing threats to critical infrastructure have significantly intensified discussions about supply security. Authorities and network operators are therefore reviewing existing emergency concepts and continuously developing them.<\/p>\n<p>This also includes preparing for prolonged power outages, where available energy might temporarily not be enough to fully supply industry, critical infrastructure, and private consumers simultaneously.<\/p>\n<h2>What does this mean for private households?<\/h2>\n<p>For private consumers, the current plans initially result in <strong>no immediate changes<\/strong>. The platform is primarily aimed at large industrial power consumers.<\/p>\n<p>Regardless, civil protection authorities have been recommending for years that people prepare for short-term power outages. This includes, among other things, drinking water, non-perishable food, flashlights, charged power banks, a battery-powered or crank-powered radio, and necessary medications. Such precautionary measures are intended to help households remain functional even during outages lasting several hours or days.<\/p>\n<hr \/>\n<h2>SEO Description<\/h2>\n<p><strong>The Federal Network Agency is developing an emergency platform for potential electricity shortages. Following the Berlin blackout affecting over 100,000 people, experts are calling for better crisis preparedness, more emergency power, and a central crisis center.<\/strong><\/p>\n<hr \/>\n<h2>Sources<\/h2>\n<ul>\n<li>t-online - Federal Network Agency prepares security platform for power outages:<br \/>\n<a href=\"https:\/\/www.t-online.de\/finanzen\/energie\/id_101367814\/strom-bundesnetzagentur-bereitet-sich-auf-lange-blackouts-vor.html\">https:\/\/www.t-online.de\/finanzen\/energie\/id_101367814\/strom-bundesnetzagentur-bereitet-sich-auf-lange-blackouts-vor.html<\/a><\/li>\n<li>t-online \u2013 100,000 Berliners without electricity in January \u2013 now the crisis report follows:<br \/>\n<a href=\"https:\/\/berlin.t-online.de\/region\/berlin\/id_101329200\/100000-berliner-im-januar-ohne-strom-jetzt-folgt-der-krisenbericht.html\">https:\/\/berlin.t-online.de\/region\/berlin\/id_101329200\/100000-berliner-im-januar-ohne-strom-jetzt-folgt-der-krisenbericht.html<\/a><\/li>\n<li>t-online \u2013 Berlin: Lessons from the blackout \u2013 what experts say:<br \/>\n<a href=\"https:\/\/berlin.t-online.de\/region\/berlin\/id_101330886\/berlin-lehren-aus-dem-blackout-das-sagen-experten.html\">https:\/\/berlin.t-online.de\/region\/berlin\/id_101330886\/berlin-lehren-aus-dem-blackout-das-sagen-experten.html<\/a><\/li>\n<li>Berlin.de \u2013 Power outage in southwestern Berlin:<br \/>\n<a href=\"https:\/\/www.berlin.de\/sen\/web\/presse\/pressemitteilungen\/2026\/pressemitteilung.1629952.php\">https:\/\/www.berlin.de\/sen\/web\/presse\/pressemitteilungen\/2026\/pressemitteilung.1629952.php<\/a><\/li>\n<li>Expert Report \u201eResilience in Berlin\u201c:<br \/>\n<a href=\"https:\/\/www.berlin.de\/rbmskzl\/_assets\/aktuelles\/expertenbericht_resilienz_final.pdf\">https:\/\/www.berlin.de\/rbmskzl\/_assets\/aktuelles\/expertenbericht_resilienz_final.pdf<\/a><\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"The Federal Network Agency is preparing for potential long-term electricity shortages and widespread power outages. At the center of this is the establishment of a new \u201eelectricity safety platform,\u201c which can be used in an emergency to coordinate the consumption of large industrial enterprises and reduce it if necessary. The plans show that the authorities are also preparing for exceptional crisis scenarios. A nationwide blackout is still considered very... <a class=\"view-article\" href=\"https:\/\/prepp.net\/en\/news\/bundesnetzagentur-notfallplattform-langanhaltende-stromausfaelle\/\">Read more<\/a>","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-3297","news","type-news","status-publish","format-standard","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Bundesnetzagentur plant Notfallplattform f\u00fcr langanhaltende Stromausf\u00e4lle - prepp.net<\/title>\n<meta name=\"description\" content=\"Bundesnetzagentur entwickelt eine Notfallplattform f\u00fcr m\u00f6gliche Stromengp\u00e4sse. Ziel: bessere Krisenvorsorge, mehr Notstrom, ein zentrales Krisenzentrum.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/prepp.net\/en\/news\/federal-network-agency-emergency-platform-for-long-term-power-outages\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Bundesnetzagentur plant Notfallplattform f\u00fcr langanhaltende Stromausf\u00e4lle - prepp.net\" \/>\n<meta property=\"og:description\" content=\"Bundesnetzagentur entwickelt eine Notfallplattform f\u00fcr m\u00f6gliche Stromengp\u00e4sse. Ziel: bessere Krisenvorsorge, mehr Notstrom, ein zentrales Krisenzentrum.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/prepp.net\/en\/news\/federal-network-agency-emergency-platform-for-long-term-power-outages\/\" \/>\n<meta property=\"og:site_name\" content=\"prepp.net\" \/>\n<meta property=\"article:modified_time\" content=\"2026-08-02T18:29:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/prepp.net\/wp-content\/uploads\/prepp-logo-800x800-1.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/prepp.net\\\/news\\\/bundesnetzagentur-notfallplattform-langanhaltende-stromausfaelle\\\/\",\"url\":\"https:\\\/\\\/prepp.net\\\/news\\\/bundesnetzagentur-notfallplattform-langanhaltende-stromausfaelle\\\/\",\"name\":\"Bundesnetzagentur plant Notfallplattform f\u00fcr langanhaltende Stromausf\u00e4lle - prepp.net\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/prepp.net\\\/#website\"},\"datePublished\":\"2026-08-02T18:28:03+00:00\",\"dateModified\":\"2026-08-02T18:29:33+00:00\",\"description\":\"Bundesnetzagentur entwickelt eine Notfallplattform f\u00fcr m\u00f6gliche Stromengp\u00e4sse. Ziel: bessere Krisenvorsorge, mehr Notstrom, ein zentrales Krisenzentrum.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/prepp.net\\\/news\\\/bundesnetzagentur-notfallplattform-langanhaltende-stromausfaelle\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/prepp.net\\\/news\\\/bundesnetzagentur-notfallplattform-langanhaltende-stromausfaelle\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/prepp.net\\\/news\\\/bundesnetzagentur-notfallplattform-langanhaltende-stromausfaelle\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/prepp.net\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/prepp.net\\\/news\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Bundesnetzagentur plant Notfallplattform f\u00fcr langanhaltende Stromausf\u00e4lle\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/prepp.net\\\/#website\",\"url\":\"https:\\\/\\\/prepp.net\\\/\",\"name\":\"prepp.net\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/prepp.net\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/prepp.net\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/prepp.net\\\/#organization\",\"name\":\"prepp.net\",\"url\":\"https:\\\/\\\/prepp.net\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/prepp.net\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/prepp.net\\\/wp-content\\\/uploads\\\/prepp-logo-800x800-1.webp\",\"contentUrl\":\"https:\\\/\\\/prepp.net\\\/wp-content\\\/uploads\\\/prepp-logo-800x800-1.webp\",\"width\":800,\"height\":800,\"caption\":\"prepp.net\"},\"image\":{\"@id\":\"https:\\\/\\\/prepp.net\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Federal Network Agency plans emergency platform for long-term power outages - prepp.net","description":"Federal Network Agency develops an emergency platform for potential power shortages. Goal: better crisis preparedness, more emergency power, a central crisis center.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/prepp.net\/en\/news\/federal-network-agency-emergency-platform-for-long-term-power-outages\/","og_locale":"en_US","og_type":"article","og_title":"Bundesnetzagentur plant Notfallplattform f\u00fcr langanhaltende Stromausf\u00e4lle - prepp.net","og_description":"Bundesnetzagentur entwickelt eine Notfallplattform f\u00fcr m\u00f6gliche Stromengp\u00e4sse. Ziel: bessere Krisenvorsorge, mehr Notstrom, ein zentrales Krisenzentrum.","og_url":"https:\/\/prepp.net\/en\/news\/federal-network-agency-emergency-platform-for-long-term-power-outages\/","og_site_name":"prepp.net","article_modified_time":"2026-08-02T18:29:33+00:00","og_image":[{"width":800,"height":800,"url":"https:\/\/prepp.net\/wp-content\/uploads\/prepp-logo-800x800-1.webp","type":"image\/webp"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/prepp.net\/news\/bundesnetzagentur-notfallplattform-langanhaltende-stromausfaelle\/","url":"https:\/\/prepp.net\/news\/bundesnetzagentur-notfallplattform-langanhaltende-stromausfaelle\/","name":"Federal Network Agency plans emergency platform for long-term power outages - prepp.net","isPartOf":{"@id":"https:\/\/prepp.net\/#website"},"datePublished":"2026-08-02T18:28:03+00:00","dateModified":"2026-08-02T18:29:33+00:00","description":"Federal Network Agency develops an emergency platform for potential power shortages. Goal: better crisis preparedness, more emergency power, a central crisis center.","breadcrumb":{"@id":"https:\/\/prepp.net\/news\/bundesnetzagentur-notfallplattform-langanhaltende-stromausfaelle\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/prepp.net\/news\/bundesnetzagentur-notfallplattform-langanhaltende-stromausfaelle\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/prepp.net\/news\/bundesnetzagentur-notfallplattform-langanhaltende-stromausfaelle\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/prepp.net\/"},{"@type":"ListItem","position":2,"name":"News","item":"https:\/\/prepp.net\/news\/"},{"@type":"ListItem","position":3,"name":"Bundesnetzagentur plant Notfallplattform f\u00fcr langanhaltende Stromausf\u00e4lle"}]},{"@type":"WebSite","@id":"https:\/\/prepp.net\/#website","url":"https:\/\/prepp.net\/","name":"prepp.net","description":"","publisher":{"@id":"https:\/\/prepp.net\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/prepp.net\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/prepp.net\/#organization","name":"prepp.net","url":"https:\/\/prepp.net\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/prepp.net\/#\/schema\/logo\/image\/","url":"https:\/\/prepp.net\/wp-content\/uploads\/prepp-logo-800x800-1.webp","contentUrl":"https:\/\/prepp.net\/wp-content\/uploads\/prepp-logo-800x800-1.webp","width":800,"height":800,"caption":"prepp.net"},"image":{"@id":"https:\/\/prepp.net\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/prepp.net\/en\/wp-json\/wp\/v2\/news\/3297","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/prepp.net\/en\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/prepp.net\/en\/wp-json\/wp\/v2\/types\/news"}],"author":[{"embeddable":true,"href":"https:\/\/prepp.net\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/prepp.net\/en\/wp-json\/wp\/v2\/comments?post=3297"}],"version-history":[{"count":4,"href":"https:\/\/prepp.net\/en\/wp-json\/wp\/v2\/news\/3297\/revisions"}],"predecessor-version":[{"id":3301,"href":"https:\/\/prepp.net\/en\/wp-json\/wp\/v2\/news\/3297\/revisions\/3301"}],"wp:attachment":[{"href":"https:\/\/prepp.net\/en\/wp-json\/wp\/v2\/media?parent=3297"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}